Rosewood by Brookfield Residential

Four-Bedroom Moderate Homes

Accepting Applicants for Round 2 - see deadlines below.

2 more units have been added to the drawing!

Round 2 Applicants: Don’t wait for the ranking results—get a head start by preparing the items listed on your Opportunity Drawing Notice. Ensure that you have everything ready and submitted before the deadlines.

Information & Announcements

Rosewood is bringing charming two-story duet homes and attached three-story townhomes to a charismatic location that checks all your boxes. Take your pick of two neighborhood collections and relish four bedrooms and up to 2,340 square feet of living space. And a colorful, curated downtown is just around the corner, with unique boutiques, plenty of places to eat and a Caltrain Station for all your out-of-town adventures. Savor award-winning wines and panoramic views at vineyards surrounding the community or catch rushing waterfalls and majestic coastal redwoods at the many parks nearby. With the homes you want, the space you need and the connectivity you crave, Rosewood is your starting point for an exciting new chapter.

Property Amenities

  • Pickleball Court, Tot-lot park, Shared public park

Solar and Non-Mortgage Costs are best estimates based on information provided by the builder. These figures may change.


Program Documents:

The Resale Restriction limits the price you can resell the house for and the amount of equity it can build. The difference between the home's fair market value and the maximum restricted resale price is known as “Excess Sales Proceeds.” This amount belongs to the program, and the City records a note and deed of trust to protect those proceeds. Among other requirements and responsibilities, you will be required to complete an annual compliance certification, validating that you as the owner are still occupying the property. Renting the property will breach program requirements disqualifying you from the program. You can hire an attorney to help you understand the Program Documents that you will be required to sign and abide by.

Restriction Term: 45 years

Program Documents and Guidelines

OPPORTUNITY DRAWING #737

  • 910 Loyola Lane

  • 961 Blaise Lane

  • 959 Bosco Lane

  • 960 Blaise Lane

4 Bedrooms / 3.5 Bath

Approx. 1844 Sq Ft

Restricted Sales Price: $615,000

Solar Requirements:

  • Purchase Cost (Estimated): $13,900

  • Lease: $138-148/month

  • Solar Requirements:  Amounts are general estimates based on the module type and panel size. The exact quote you'll receive from Complete Solar once in contract with the home takes into account the utility's current rate at that point in time AND factors specific to the home (panel orientation, home elevation, roof, and solar designs, etc.).

Other Monthly Non-Mortgage Costs (Estimated and may change):

  • Monthly HOA dues: $424.00

  • Home Insurance Requirement: HO6

  • Direct Levies and Mello Roos Approx. $3,579.56/year or $298.30/month

  • Property Taxes: Approx $641/month; check with your loan officer

Property Designated AMI: Up to Moderate

Occupancy Standard: Household Minimum 3, Maximum 9 people. Owners must occupy the home.

Resale Restriction Terms: 45 Years (Review the documents)

First-Time Home Buyer Requirement: Yes (see guidelines for the definition)

Please refer to the ODN (Right) for additional information

Important Information

  • Drawing release Date: 9/12/2025

Round 2 (2nd Ranking)

  • Deadline to Enter Drawing: 10/31/2025 5:00 pm

  • Results Published: 11/3/2025

  • File Submission Deadline: 11/6/2025 5:00 pm

Opportunity Drawing Notice OD 737 - Updated 10.24.2025
Enter Drawing
Don't have an account? Follow the Steps Here!

Estimated minimum household income: $140,887

Estimated Cost Breakdown


Timelines

Round 1: Lottery with City Preferences: Deadline to Enter Drawing & Select City Preferences: 9/23/2025 5pm, Results Published: 9/30/2025, File Submission Deadline with City Preferences Supporting Docs: 10/7/2025 5:00 pm

Round 2: By Date and Time Stamp - No City Preferences: Applicants who entered after 9/23/2025 5pm through 10/31/2025 5pm, Ranking 11/3/2025, File Submission Deadline 11/6/2025 5pm


Opportunity Drawing Notices

Opportunity Drawing Notice - Round 1 - OD 737

Drawing Results

The Ranking Results posted below have not been audited. Final Ranking Numbers will change as we move down the list when we audit and underwrite the claimed preferences/points until an eligible buyer has been identified. Please log in to your account at www.myhousekeys.com to find the updated Final Ranking numbers based on our findings during the application process. They will continue to be updated as we move down the list. Rest assured that the Initial Ranking Numbers, aka lottery numbers, will not change. Note: You will not have a ranking number if you entered the drawing after the drawing entry deadline

OD 737 Initial Ranking Results (Round 1) 9.30.2025
How To locate your final ranking number

City Preferences

Applicants must select the City Preferences by the Drawing Entry deadline and submit proof they meet them by the File Submission Deadline. The Final Ranking number is subject to change after preferences are verified. Applicants cannot adjust their City Preference Tiers/Points after the Drawing Entry Deadline. Preference Tiers/Point adjustments or corrections by the applicant after the Drawing Entry Deadline will not be considered. The Preference will be invalidated if supporting documents are not submitted on time or if insufficient proof is submitted.

Exhibit E - City Preferences Form
How to indicate you meet a city preference (or edit before the drawing entry deadline)
How to upload supporting documents for city preferences

 

Historical Information

No longer applicable to the drawings.

Ranking Results OD 625 - 10.30.2024